Skip to content

Utilizing Peak Water Demand Calculator benefits developers, builders and residents.

CPC Appendix M or the Water Demand Calculator (WDC) provides a
method for estimating the demand load for the building water supply,
principal branches, and risers for single family and multifamily dwellings.

The peak water demands derived using CPC Appendix M inform the
recommended diameter of water supply pipes. The alternative approach of
using CPC Appendix M methodology in conjunction with CPC Appendix A
or pipe sizing yields lower design flow rates and smaller distribution piping
when compared to using only CPC Appendix A.

Construction cost savings to builders from:

  • Smaller diameter pipes and fittings, valves, pumps, and other equipment
  • Smaller inside diameter pipe insulation
  • Smaller water service entrance size, resulting in smaller water meter size with lower connection fees.
Ongoing cost savings to occupants and homeowners from:
  • Water savings from faster hot water delivery, resulting in smaller monthly water service charges and lower associated volumetric sewer charges
  • Energy savings due to decreased heat loss in the hot water distribution system.
  • Faster delivery of hot water to occupants.
  • Reduced public health and safety risk and improved water quality due to shorter water dwell times within plumbing systems.
  • Reduced carbon emissions due to material savings and energy reductions.

Link to Fact Sheet CPC Appendix M
Link to Fact Sheet IAPMO